329 Ind. Admin. Code 11-2-8.3

Current through May 29, 2024
Section 329 IAC 11-2-8.3 - "Contingency action plan" defined

Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1

Affected: IC 13-30-2; IC 25-31; IC 36-9-30

Sec. 8.3.

"Contingency action plan" means a written course of action to be followed for the method or methods of waste management or disposal if the facility is unable to operate or process solid waste for twenty-four (24) hours or longer.

329 IAC 11-2-8.3

Solid Waste Management Board; 329 IAC 11-2-8.3; filed Jun 28, 2010, 2:11 p.m.: 20100728-IR-329060070FRA
Readopted filed Jun 6, 2016, 11:52 a.m.: 20160706-IR-329160144BFA