Authority: IC 13-14-8-7; IC 13-15; IC 13-19-3
Affected: IC 13-19; IC 25-31; IC 36-9-30
Sec. 5.7.
"Closure certification" means a written certification signed by the owner, operator, or permittee and an independent registered professional engineer submitted to the commissioner stating that closure for all units of the facility have been completed in accordance with the approved closure plan.
329 IAC 11-2-5.7