Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1
Affected: IC 13-30-2; IC 25-31; IC 36-9-30
Sec. 24.2.
"Operating days" means time expressed in total number of days during which a solid waste processing facility is open to actively accept solid waste for processing.
329 IAC 11-2-24.2