Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1
Affected: IC 13-30-2; IC 36-9-30
Sec. 21.1.
"Major modification of solid waste processing facilities" means any of the following:
(1) Any increase in a permitted solid waste processing facility that would increase the facility's permitted capacity to process solid waste by more than ten percent (10%) or the addition of a major piece of equipment, such as a compactor, that increases the facility's permitted capacity to process solid waste by more than ten percent (10%).(2) New bay loading area.(4) Expansion of an existing loading bay or tunnel so that additional transfer trailers can be loaded simultaneously.(5) Expansion of the existing waste processing area by more than fifty percent (50%) either through:(A) expansion of the area within an existing building; or(B) the addition of a new building.Solid Waste Management Board; 329 IAC 11-2-21.1; filed Jun 28, 2010, 2:11 p.m.: 20100728-IR-329060070FRAReadopted filed Jun 6, 2016, 11:52 a.m.: 20160706-IR-329160144BFA