329 Ind. Admin. Code 11-13.5-8

Current through May 29, 2024
Section 329 IAC 11-13.5-8 - Use of contingency action plan

Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1

Affected: IC 13-30-2; IC 36-9-30

Sec. 8.

If the facility is unable to operate or process solid waste in accordance with its approved operating plan for more than a continuous twenty-four (24) hour period, the contingency action plan required in 329 IAC 11-9-2(j)(6) must be implemented.

329 IAC 11-13.5-8

Solid Waste Management Board; 329 IAC 11-13.5-8; filed Jun 28, 2010, 2:11 p.m.: 20100728-IR-329060070FRA
Readopted filed Jun 6, 2016, 11:52 a.m.: 20160706-IR-329160144BFA