Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1
Affected: IC 13-30-2; IC 36-9-30
Sec. 8.
If the facility is unable to operate or process solid waste in accordance with its approved operating plan for more than a continuous twenty-four (24) hour period, the contingency action plan required in 329 IAC 11-9-2(j)(6) must be implemented.
329 IAC 11-13.5-8