Current through December 12, 2024
Section 329 IAC 10-37-3 - Final cover; construction/demolition sitesAuthority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1
Affected: IC 13-30-2; IC 36-9-30
Sec. 3.
(a) Owners or operators of a construction/demolition site shall apply no less than two (2) feet of final cover over any area in the fill within one hundred eighty (180) days when:(1) solid waste has not been disposed for one (1) year; or(2) any area of the construction/demolition site has been filled to its approved elevation. (b) The construction/demolition site must meet the following requirements for final cover:(1) The maximum projected erosion rate must be five (5) tons per acre per year.(2) The final compacted cover must be as specified in subsection (a).(3) The final cover must have a slope of not less than two percent (2%) and not greater than thirty-three percent (33%).Solid Waste Management Board; 329 IAC 10-37-3; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1915; readopted filed Jan 10, 2001, 3:25 p.m.: 24 IR 1535; readopted filed May 14, 2007, 1:53 p.m.: 20070523-IR-329070138BFAReadopted filed Jul 29, 2013, 9:20 a.m.: 20130828-IR-329130179BFA; readopted filed Jun 14, 2019, 2:00 p.m.: 20190710-IR-329190249BFA