329 Ind. Admin. Code 10-37-3

Current through May 29, 2024
Section 329 IAC 10-37-3 - Final cover; construction/demolition sites

Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1

Affected: IC 13-30-2; IC 36-9-30

Sec. 3.

(a) Owners or operators of a construction/demolition site shall apply no less than two (2) feet of final cover over any area in the fill within one hundred eighty (180) days when:
(1) solid waste has not been disposed for one (1) year; or
(2) any area of the construction/demolition site has been filled to its approved elevation.
(b) The construction/demolition site must meet the following requirements for final cover:
(1) The maximum projected erosion rate must be five (5) tons per acre per year.
(2) The final compacted cover must be as specified in subsection (a).
(3) The final cover must have a slope of not less than two percent (2%) and not greater than thirty-three percent (33%).

329 IAC 10-37-3

Solid Waste Management Board; 329 IAC 10-37-3; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1915; readopted filed Jan 10, 2001, 3:25 p.m.: 24 IR 1535; readopted filed May 14, 2007, 1:53 p.m.: 20070523-IR-329070138BFA
Readopted filed Jul 29, 2013, 9:20 a.m.: 20130828-IR-329130179BFA; readopted filed Jun 14, 2019, 2:00 p.m.: 20190710-IR-329190249BFA