329 Ind. Admin. Code 10-36-14

Current through May 29, 2024
Section 329 IAC 10-36-14 - Grading and soil stabilization

Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1

Affected: IC 13-30-2; IC 36-9-30

Sec. 14.

(a) Cover material applied as required in sections 11 through 13 of this rule and 329 IAC 10-37 must be continuously maintained, including application and compaction of additional cover as needed to maintain required depth.
(b) A grass or ground cover crop must be established and maintained continuously as soon as weather permits and seasonal conditions are suitable on any portion of the restricted waste site Type III or construction/demolition site that has received final cover except where other provisions for land use have been approved by the commissioner.
(c) A restricted waste site Type III and a construction/demolition site must be graded to promote surface water drainage and to prevent the ponding of water on previously filled areas.
(d) Vegetation must be cleared only as necessary.

329 IAC 10-36-14

Solid Waste Management Board; 329 IAC 10-36-14; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1914; readopted filed Jan 10, 2001, 3:25 p.m.: 24 IR 1535; readopted filed May 14, 2007, 1:53 p.m.: 20070523-IR-329070138BFA
Readopted filed Jul 29, 2013, 9:20 a.m.: 20130828-IR-329130179BFA; readopted filed Jun 14, 2019, 2:00 p.m.: 20190710-IR-329190249BFA