Section 329 IAC 10-35-2 - Preoperational requirementsAuthority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1
Affected: IC 13-30-2; IC 36-9-30
Sec. 2.
(a) Before beginning operation, owners or operators of a restricted waste site Type III shall be required to establish a series of identifiable boundary markers that will delineate the approved facility boundaries and solid waste boundaries for the life of the facility.(b) Before beginning operation, owners or operators of construction/demolition sites shall be required to complete the following: (1) Establish a series of identifiable boundary markers that will delineate the approved facility boundaries and solid waste boundaries for the life of the facility.(2) Complete initial site development and construction in accordance with the initial facility development plan required in 329 IAC 10-32 and complete other preoperational requirements imposed as conditions to the facility permit.(3) Establish permanent, on-site benchmark or benchmarks with vertical, mean sea level elevation, and horizontal control so that no portion of the proposed fill area is further than one thousand (1,000) feet from a benchmark. However, distances greater than the specified one thousand (1,000) feet may be allowed where necessary to avoid the placement of benchmarks on filled areas.Solid Waste Management Board; 329 IAC 10-35-2; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1911; readopted filed Jan 10, 2001, 3:25 p.m.: 24 IR 1535; readopted filed May 14, 2007, 1:53 p.m.: 20070523-IR-329070138BFAReadopted filed Jul 29, 2013, 9:20 a.m.: 20130828-IR-329130179BFA; readopted filed Jun 14, 2019, 2:00 p.m.: 20190710-IR-329190249BFA