Authority: IC 13-14-8-7; IC 13-15; IC 13-19-3
Affected: IC 13-20; IC 36-9-30
Sec. 3.
The approved post-closure plan must become a condition of the permit. If the permit expires or is revoked, the post-closure plan remains effective and enforceable during the post-closure period. If the plan is determined to be unacceptable, the commissioner shall identify the items needed to make it complete.
and the frequency at which they will be performed.
unless necessary to comply with this article. The commissioner may approve other disturbances if the owner, operator, or permittee demonstrates that disturbance of the final cover, liner, or other component of the containment system, including any removal of waste, will not increase the potential threat to human health or the environment.
Year | Gallons Per Acre Per Day (GPAD) |
1-5 | 150 |
6-10 | 80 |
11-15 | 50 |
16-20 | 30 |
21-25 | 20 |
26-30 | 10 |
The commissioner may increase or decrease this amount of funding if it is determined that, based on a site-specific basis, more or less funds are necessary. A partial closure for leachate generation rate, based on the rates described in this clause, may be granted if the owner, operator, or permittee of an MSWLF provides actual leachate generation rate data of an area for at least a two (2) years duration after final cover is installed and certified.
329 IAC 10-23-3