Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1
Affected: IC 13-30-2; IC 36-9-30
Sec. 10.
Any final cover required by this rule must be constructed and tested according to all the applicable construction quality control and construction quality assurance (CQC/CQA) requirements in 329 IAC 10-15-7 and 329 IAC 10-17.
329 IAC 10-22-10