Section 329 IAC 10-21-3 - Duration of monitoring program

Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1

Affected: IC 13-30-2; IC 36-9-30

Sec. 3.

(a) Once established at an MSWLF, ground water monitoring must be conducted throughout the active life, closure, and post-closure care periods of the MSWLF.
(b) Ground water monitoring may be extended beyond the post-closure care period if an assessment ground water monitoring program or a corrective action program is being conducted at an MSWLF and the commissioner determines that an MSWLF unit within the MSWLF is adversely affecting ground water or poses a threat to human health or the environment.

329 IAC 10-21-3

Solid Waste Management Board; 329 IAC 10-21-3; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1863; filed Aug 2, 1999, 11:50 a.m.: 22 IR 3845