Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1
Affected: IC 13-30-2; IC 36-9-30
Sec. 66.2.
"Erosion and sediment control measure" means a practice, or a combination of practices, to control erosion and resulting sedimentation.
329 IAC 10-2-66.2
Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1
Affected: IC 13-30-2; IC 36-9-30
Sec. 66.2.
"Erosion and sediment control measure" means a practice, or a combination of practices, to control erosion and resulting sedimentation.
329 IAC 10-2-66.2