Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1
Affected: IC 13-30-2; IC 25-31; IC 36-9-30
Sec. 140.
"Post-closure cost estimate" means the original or most recently submitted written estimate, in current dollars, of the total cost of post-closure monitoring and maintenance of the solid waste land disposal facility during the entire post-closure care period in accordance with the post-closure plan.
329 IAC 10-2-140