Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1
Affected: IC 13-20; IC 36-9-30
Sec. 1.
On or after the effective date of this article, new MSWLFs and lateral expansions for which application is being made for a permit must comply with the design, construction, and CQA/CQC requirements of this rule.
329 IAC 10-17-1