329 Ind. Admin. Code 10-15-1

Current through May 29, 2024
Section 329 IAC 10-15-1 - General requirements

Authority: IC 13-14-8-7; IC 13-15; IC 13-19-3

Affected: IC 13-20; IC 25-17.6-1-6.5; IC 36-9-30

Sec. 1.

(a) A permit application for a new MSWLF or a lateral expansion must be accompanied by the following plans and documentation:
(1) Plot plans as specified under section 2 of this rule.
(2) Cross-sectional drawings and details as specified under section 3 of this rule.
(3) A hydrogeologic site investigation report as specified under sections 4 and 5 of this rule.
(4) An operational plan of the proposed MSWLF as specified under section 6 of this rule.
(5) A CQA/CQC plan as specified under section 7 of this rule.
(6) Calculations and analyses pertaining to MSWLF design as specified under section 8 of this rule.
(7) An explosive gas management plan as specified under 329 IAC 10-20-17.
(8) A closure plan as specified under 329 IAC 10-22-2.
(9) A post-closure plan, as specified under 329 IAC 10-23-3.
(10) A quality assurance project plan as specified under 329 IAC 10-21-2(b)(13).
(11) A sampling and analysis plan as specified under 329 IAC 10-21-2.
(12) A general description for developing the statistical evaluation plan that is required by 329 IAC 10-21-6(c). The description must include a time frame for submitting the statistical evaluation plan.
(13) If applicable, a baled waste management plan as specified under section 9 of this rule.
(14) A leak detection plan as specified under section 10 of this rule.
(15) A leachate collection contingency plan as specified under section 11 of this rule.
(16) A storm water pollution prevention plan as specified under section 12 of this rule.
(17) Other plans as may be required by the commissioner based on particular site or facility conditions.
(b) Plans and documentation that accompany a permit application for a new MSWLF or a lateral expansion must be certified as follows:
(1) The hydrogeologic site investigation report required in subsection (a)(3) must be certified by a licensed professional geologist or a qualified ground water scientist, either of whom shall have educational or professional experience in hydrogeology or ground water hydrology.
(2) With the exception of the hydrogeologic site investigation report and the sampling and analysis plan, all plans and documentation required in subsection (a) must be certified by a registered professional engineer.
(c) A full set of plans and documentation required by this section must accompany each of the five (5) copies of the permit application required in 329 IAC 10-11-2.1(c).
(d) All plans and documentation must be properly titled.

329 IAC 10-15-1

Solid Waste Management Board; 329 IAC 10-15-1; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1817; filed Mar 19, 1998, 11:07 a.m.: 21 IR 2760; filed Aug 2, 1999, 11:50 a.m.: 22 IR 3797; filed Feb 9, 2004, 4:51 p.m.: 27 IR 1808, eff Apr 1, 2004