Authority: IC 13-23
Affected: IC 13-12-3-2; IC 13-23-3-2; IC 13-23-8-4; IC 13-23-9-1.5
Sec. 5.
In no event will the fund pay for purchases of machinery and equipment in excess of the market cost of leasing the item for a corrective action. Examples of equipment charges that can be made to the fund are disposable bailers and sample bottles.
an underground petroleum storage tank or its associated equipment.
However, eligible parties may seek reimbursement for these costs if the costs meet the requirements in subsection (b)(13).
Activity | Cost Range or Maximum Amount |
SITE CHARACTERIZATION | |
Direct push technology (other costs pertaining to direct push technology are included in the per foot allowance specified). | $600 per day |
In addition to the day rate, costs for boring advancement may be invoiced at the following per foot rates: | $6 per foot |
Mobilization and demobilization. This includes the cost of moving general contractor owned equipment, setup, and removing equipment. | $400 |
Soil borings, for purposes of soil or ground water sampling or monitoring well installation when using a hollow stem auger. | |
Number of feet in incremental amounts | |
4.25 inch inside diameter | |
For the first 15 feet | $24 per foot |
16 through 25 feet | $30 per foot |
26 feet or more | $35 per foot |
6.25 inch inside diameter | |
For the first 15 feet | $27 per foot |
16 through 25 feet | $33 per foot |
26 feet or more | $38 per foot |
8.25 inch inside diameter | |
For the first 15 feet | $30 per foot |
16 through 25 feet | $36 per foot |
26 feet or more | $41 per foot |
Rock drilling beyond auger refusal is reimbursed at the above rates with an additional $15 per foot. | |
These amounts may only be charged one (1) time per borehole. | |
Sample collection is part of well installation. Direct push technology must be used when it is most appropriate to the site and cost effective. The diameter of the boring must be appropriate for the size of the well being installed. | |
Blind drilling using a hollow stem auger when well borings have already been logged within five (5) feet. | |
4.25 inch inside diameter | |
For the first 50 feet | $10 per foot |
51 feet or more | $12 per foot |
6.25 inch inside diameter | |
For the first 50 feet | $13 per foot |
51 feet or more | $15 per foot |
8.25 inch inside diameter | |
For the first 50 feet | $15 per foot |
51 feet or more | $18 per foot |
Decontamination and equipment cleaning | $12 per each 5 feet of boring |
Cutting holes in concrete or asphalt (12 inches in diameter) | $110 per hole |
Materials | |
Well casing and screen (including riser) filter pack, annular, and surface seal: | |
< 2 inch well | Applicable boring rate plus materials |
2 inch well | $9 per foot |
4 inch well | $15 per foot |
6 inch well | $27 per foot |
Flush-grade well covers | $125 per cover |
Laboratory services, including containers, packaging, and postage. | |
Soil analysis methods | |
TPH-8015 GRO | $50 per sample |
TPH-8015 DRO | $50 per sample |
TPH-8015 ERO | $50 per sample |
TPH-418.1 | $95 per sample |
TRPH-HEM-1664/9071B | $60 per sample |
VOC-8260 | $130 per sample |
SVOC-8270 | $225 per sample |
PAH-8270SIM | $130 per sample |
PAH-8310 | $150 per sample |
PCB-8082 | $110 per sample |
Metals- 7 barium, cadmium, chromium, lead, mercury, nickel, zinc | $100 per sample |
(Individual metals) | $10 per sample |
BTEX/MTBE-8021 | $60 per sample |
BTEX/MTBE-8260 | $80 per sample |
Ignitability | $30 per sample |
Fraction of organic carbon | $70 per sample |
Water analysis methods | |
TPH-8015 GRO | $50 per sample |
TPH-8015 DRO | $50 per sample |
TPH-8015 ERO | $50 per sample |
TPH-8015 Methane | $80 per sample |
TRPH-HEM-1664 | $50 per sample |
VOC-8260 | $135 per sample |
BTEX/MTBE-8021 | $50 per sample |
BTEX/MTBE-8260 | $80 per sample |
SVOC-8270 | $225 per sample |
PAH-8270 SIM | $135 per sample |
PAH-8310 | $150 per sample |
Metals- 7 barium, cadmium, chromium, lead, mercury, nickel, zinc | $100 per sample |
(Individual metals) | $10 per sample |
Metal-soluble iron | $25 per sample |
Nitrates | $25 per sample |
Sulfate | $25 per sample |
Sulfide | $25 per sample |
COD | $20 per sample |
BOD5 | $40 per sample |
Total suspended solids | $20 per sample |
Air analysis methods | |
VOC-TO-15 | $400 per sample |
Other Methods | |
TCLP-lead | $100 per sample |
If the commissioner requires all quality assurance/quality control (QA/QC), including raw data and internal chain of custody necessary to validate analytical results. | 20% markup allowed per sample |
PERSONNEL
When submitting a claim for reimbursement, the applicant is required to give the personnel classification, task being performed, and the name of the individual performing the task. Rates are paid based on the task performed by an employee rather than the qualifications of the employee. Refer to subsection (f) for task descriptions for personnel classifications. These labor rates are adjusted annually on June 1 of each year, in accordance with the product price index (PPI) percentage listed for December of the previous year. The North American Industry Classification System (NAICS) Code for Environmental Consulting Services is 541620 and is described at: https://www.naics.com/naics-code-description/?code=541620
The PPI Industry data tables are available through the Bureau of Labor and Statistics
(BLS) at: https://www.bls.gov/ppi/home.htm
Principal | $136 per hour |
Senior project manager | $126 per hour |
Project manager | $103 per hour |
Staff project person | $87 per hour |
Field/ELTF claims technician | $59 per hour |
Drafting person | $50 per hour |
Word processor/clerical | $35 per hour |
Toxicologist | $155 per hour |
INITIAL ABATEMENT AND FREE PRODUCT REMOVAL | |
Except where provided in this rule, approval of costs is on a case-by-case basis. | |
SITE SET-UP PREPARATION | |
Trailer rental | $360 per month ($12 per day) |
Portable toilet | $180 per month ($6 per day) |
Utility check, the date and time of the utility check must be documented. | |
Utility check includes air knifing, hand augering, and private utility location service. | $800 |
Utilities for temporary facilities | |
Temporary power | $600 per month ($20 per day) |
Temporary water | $180 per month ($6 per day) |
Temporary phone | $240 per month ($8 per day) |
DEMOLITION | |
Three (3) bids must be submitted for demolition of structures in accordance with an approved CAP for reimbursement consideration as defined under CORRECTIVE ACTION TECHNOLOGIES. | |
EXCAVATION | |
Activities in accordance with an approved CAP are considered for reimbursement based upon the submittal of three (3) bids as defined under CORRECTIVE ACTION TECHNOLOGIES or the following unit rates: | |
Equipment costs and labor $2.70 per ton | |
Mobilization (includes vehicle mileage) $400 per trailer | |
Stockpiling soil on-site $1.65 per ton | |
Tank removal, decommissioning, cutting, and disposal are not eligible for reimbursement unless approved as part of corrective action. | |
Under 1,000 gallons | $1,200 per tank |
1,000 through 5,999 gallons | $1,800 per tank |
6,000 through 10,000 gallons | $2,400 per tank |
Above 10,000 gallons | $3,000 per tank |
Costs for pumping, testing, and disposal of tank contents are not eligible for reimbursement. | |
Three (3) bids must be submitted for demolition of structures in accordance with an approved CAP for reimbursement consideration as defined under CORRECTIVE ACTION TECHNOLOGIES. | |
Mobilization (includes vehicle mileage) | $400 per trailer |
Concrete and asphalt removal |
Saw concrete, prices are per linear foot | ||
4 inch concrete | 6 inch concrete | |
Under 200 feet | $1.60 per foot | $2.40 per foot |
200 through 400 feet | $1.70 per foot | $2.20 per foot |
400 through 600 feet | $1.60 per foot | $2.10 per foot |
600 through 1,000 feet | $1.45 per foot | $2 per foot |
Over 1,000 feet | $1.30 per foot | $1.80 per foot |
Saw asphalt, prices are per linear foot | |||
3 inch asphalt | 4 inch asphalt | 6 inch asphalt | |
Under 450 feet | $2.20 per foot | $2.30 per foot | $3.60 per foot |
450 through 600 feet | $1.80 per foot | $2.20 per foot | $2.50 per foot |
600 through 1,000 feet | $1.60 per foot | $1.80 per foot | $2.20 per foot |
Over 1,000 feet | $1.50 per foot | $1.60 per foot | $1.80 per foot |
Hauling | $85 per hour per truck |
The administrator shall approve hauling costs based on three (3) bids.
TRANSPORTATION
Activities in accordance with an approved CAP are considered for reimbursement based upon the submittal of three (3) bids as defined under CORRECTIVE ACTION TECHNOLOGIES or the following unit rates:
Loading | $1.65 per ton |
Mobilization (includes vehicle mileage) | $400 per trailer |
Hauling mileage must be documented | $85 per hour per truck |
For excavation, stockpiling, and loading of less than 300 tons in a $1,200 per day or the actual cost, whichever is less single day.
DISPOSAL OF SOIL, GROUND WATER, AND TRASH
Landfill fees
Sampling required by landfill. Receipts and analytical results from local municipality must be included.
Sanitary sewer, if approved for disposal of treated ground water. Receipts must be included.
Contaminated or disposable equipment and decontamination fluids.
Landfill reimbursement must not exceed the least expensive combination of documented hauling costs and documented disposal costs at a permitted landfill. Applicant must submit a cost justification if the applicant does not use the nearest land disposal facility permitted and willing to accept the applicant's waste.
CORRECTIVE ACTION TECHNOLOGIES
The maximum costs for the work done for corrective action are allowed on the basis of the lowest of three (3) comparable, competitive bids for the work specified in the approved CAP. Bids for the work specified in the CAP must include bids for installation and labor; however, separate bids may be obtained for cost of installation and labor. Copies of the request for proposal (RFP) for implementation of CAP that was sent to each vendor must be submitted. Each RFP and bid submittal is required to show a line item breakdown of the tasks to be performed in order to verify that all tasks are eligible for reimbursement. The administrator may approve costs based on less than three (3) bids if a demonstration is provided to the administrator that lower costs for the specified work is not possible or practical.
Lease or rental on equipment must not be reimbursed above the purchase price.
SITE RESTORATION
Activities in accordance with an approved CAP are considered for reimbursement based upon the submittal of three (3) bids as defined under CORRECTIVE ACTION TECHNOLOGIES or the following unit rates:
Backfill hauling | $85 per hour per truck |
Backfill material | $18 per ton of stone |
$9 per ton of soil | |
Backfill placement, compaction, and density verification | $6 per ton |
Resurfacing | |
4 inch concrete | $5 per square foot |
For each additional inch of concrete | Add $0.75 per square foot |
For rebar | Add 15% |
Asphalt pad, 4 inch thickness | $2.75 per square foot |
Asphalt curb and gutter | $6 per linear foot |
Island forms | |
4 feet by 10 feet with 2 foot bumpers | $900 each |
4 feet by 16 feet with 2 foot bumpers | $1,400 each |
Equipment rental (based on daily rate; not an inclusive list) | |
Decontamination equipment (bucket, brushes, and detergent) | $15 |
Power auger | $60 |
Hand auger sampling kit (hand auger/brass sleeves) | $42 |
Slide hammer core sampler | $42 |
Photoionization detector | $90 |
Flame ionization detector | $135 |
LED/O2 meter | $60 |
pH and conductivity meter | $24 |
Dissolved oxygen meter | $36 |
Oxidation/reduction meter (REDOX) | $50 |
Multiparameter water quality meter including pH, dissolved | $60 |
oxygen, temperature, and conductivity | |
Ferrous iron field test | $8 per sample |
Hydrogen sulfite field test | $8 per sample |
Geographic positioning system (GPS) unit for site mapping to 1 | $120 |
foot accuracy | |
2 inch submersible pump | $140 |
4 inch submersible pump | $115 |
Steam cleaner/pressure washer | $90 |
Water level indicator | $15 |
Oil/water interface probe | $70 |
Bailer rental | $20 |
Anemometer | $42 |
Carbon dioxide meter | $30 |
Portable generator, generator <= 5kW | $60 |
Portable generator, generator <= 10kW | $120 |
Portable generator, generator > 10kW | $150 |
328 IAC 1-3-5