327 Ind. Admin. Code 8-4.1-9

Current through January 8, 2025
Section 327 IAC 8-4.1-9 - Phase II submittal requirements

Authority: IC 13-14-8; IC 13-18-3; IC 13-18-17-6

Affected: IC 13-11; IC 13-13; IC 13-18

Sec. 9.

To have Phase II of a WHPP approved by the department, a CPWSS must submit the following material within the time frame prescribed in section 16 of this rule:

(1) Phase II delineation must include the following:
(A) An updated Phase I submittal reflecting changes, if any.
(B) A discussion describing how the updated WHPA compares with the previously delineated WHPA.
(2) Phase II potential sources of contamination inventory must include an update to the source inventory provided in the Phase I submittal.
(3) Phase II management plan must include the results of the implementation of Phase I management plan.
(4) Phase II contingency plan must include documentation of training given to local responders.

327 IAC 8-4.1-9

Water Pollution Control Board; 327 IAC 8-4.1-9; filed Feb 28, 1997, 4:18 p.m.: 20 IR 1727; readopted filed Jan 10, 2001, 3:23 p.m.: 24 IR 1518; readopted filed Nov 21, 2007, 1:16 p.m.: 20071219-IR-327070553BFA; readopted filed Jul 29, 2013, 9:21 a.m.: 20130828-IR-327130176BFA
Readopted filed Jun 6, 2019, 1:59 p.m.: 20190710-IR-327190246BFA