Authority: IC 13-14-8; IC 13-18-3; IC 13-18-17-6
Affected: IC 13-11; IC 13-13; IC 13-18
Sec. 16.
Table 1 - Wellhead Protection Overview
PHASE I | PHASE II | |||
Public Water Supply System Size (population served) | Submittal Time (years) | Submittal Requirements | Submittal Time from Phase I Approval (years) | Submittal and Update Requirements |
Large >50,001 | 3 | 1. Names, roles, and affiliation of the local planning team members. 2. WHPA delineation, including: A. Summary of geologic and hydrologic condition of the WHPA. B. Model input data. C. Justification of model choice. 3. Potential sources of contamination inventory. 4. Management strategy with schedule for implementation. 5. Contingency plan. 6. Description of public participation. 7. Description of public education program. | 5 | 1. Comprehensive WHPP. 2. Updated schedule of implementation. 3. Updated WHPA, considering new data if any. 4. Updated potential sources of contamination inventory. 5. Report of any problems or concerns regarding WHPP. 6. Contingency plan revisions (if needed). 7. Documentation to confirm: A. Sanitary Setback Area meets requirements. B. Abandoned wells are identified. C. Wellhead is secured from unauthorized access. D. All potential sources of contamination within the WHPA are managed. E. Signs are posted at WHPA perimeter. F. Public education is ongoing. G. Any new ground water contamination within the WHPA is reported. |
Medium 3,301 to 50,000 | 4 | 7 | ||
Small <3,300 | 5 | 10 |
327 IAC 8-4.1-16