Current through January 8, 2025
Section 327 IAC 8-3.6-7 - Certification of capacityAuthority: IC 13-13-5; IC 13-15-1-2; IC 13-15-2-1
Affected: IC 13-18-16
Sec. 7.
(a) The commissioner shall do the following:(1) Review a water system management plan that contains the following: (A) The information required by this rule.(B) A statement signed by the owner or person in responsible charge of the public water supply system attesting to having reviewed and to understanding the contents of the water system management plan.(2) Deny the water system management plan and return it to the applicant if the plan fails to demonstrate the technical, financial, or managerial capacity of the proposed public water supply system.(3) Issue a written determination that the public water supply system has met the technical, financial, and managerial capacity requirements of this rule.(b) The commissioner may contact the applicant, by letter, to request omitted or supplemental information that is related to the water system management plan of the public water supply system.Water Pollution Control Board; 327 IAC 8-3.6-7; filed Aug 10, 1999, 8:54 a.m.: 22 IR 3682; readopted filed Jan 10, 2001, 3:23 p.m.: 24 IR 1518; readopted filed Nov 21, 2007, 1:16 p.m.: 20071219-IR-327070553BFA; readopted filed Jul 29, 2013, 9:21 a.m.: 20130828-IR-327130176BFAReadopted filed Jun 6, 2019, 1:59 p.m.: 20190710-IR-327190246BFA