Current through November 6, 2024
Section 327 IAC 7.1-8-5 - Operational requirementsAuthority: IC 13-14-8; IC 13-18-12-4
Affected: IC 13-18-12
Sec. 5.
A person land applying septage must comply with the following conditions and any additional requirements in a septage management permit issued by the commissioner:
(1) The valid septage management permit or copy of the septage management permit must be carried in any vehicle disposing of septage at an application site at all times.(2) The septage management permit or copy of the septage management permit must be available for inspection by the department or any law enforcement officer.(3) The property on which the septage land application site is located must be posted with signs: (A) reading, "NO TRESPASSING"; and(B) along all access points to the site.(4) The usable portion of a land application site is the area that is: (A) indicated on the septage management permit application;(B) remaining after setbacks and all other restrictions are applied; and(C) clearly marked every one hundred (100) yards at its boundaries by flags or other boundary markers.(5) All other applicable requirements of this rule.Water Pollution Control Board; 327 IAC 7.1-8-5; filed Jul 8, 2002, 2:01 p.m.: 25 IR 3734; readopted filed Jun 4, 2008, 11:07 a.m.: 20080702-IR-327080207BFAReadopted filed Jul 30, 2014, 4:04 p.m.: 20140827-IR-327140189BFAReadopted filed 5/27/2020, 11:52 a.m.: 20200624-IR-327200186BFAFiled 3/3/2022, 10:40 a.m.: 20220330-IR-327140029FRA