Authority: IC 13-14-8; IC 13-18-12-4
Affected: IC 13-18-12; IC 13-30-10; IC 36-9-30-35
Sec. 3.
The commissioner may issue or renew requirements for land application in a septage management permit only after the following:
(1) Receipt by the department of a completed application in accordance with section 1 of this rule.(2) A review of the proposed land application site to determine if the site and proposed methods of application will comply with the requirements of this rule.(3) A valid septage management permit: (A) has been issued to the applicant under this article; or(B) will be issued at the same time as the land application requirements.Water Pollution Control Board; 327 IAC 7.1-8-3; filed Jul 8, 2002, 2:01 p.m.: 25 IR 3734; errata filed Aug 9, 2002, 10:16 a.m.: 25 IR 4113; readopted filed Jun 4, 2008, 11:07 a.m.: 20080702-IR-327080207BFA; readopted filed Jul 30, 2014, 4:04 p.m.: 20140827-IR-327140189BFAErrata filed 7/31/2017, 11:06 a.m.: 20170809-IR-327170349ACAErrata filed Jul 31, 2017, 11:06 a.m.: 20170809-IR-327170349ACAReadopted filed 5/27/2020, 11:52 a.m.: 20200624-IR-327200186BFAFiled 3/3/2022, 10:40 a.m.: 20220330-IR-327140029FRA