327 Ind. Admin. Code 17-2-2

Current through December 4, 2024
Section 327 IAC 17-2-2 - Applicability

Authority: IC 13-18-3-1; IC 13-18-22-1; IC 13-18-22-7

Affected: IC 13-18-3; IC 13-18-4; IC 14-34

Sec. 2.

(a) This rule applies to persons proposing to undertake wetland activities in Class I and Class II SRWs that will have minimal impacts, as described in this rule.
(b) Wetland activities covered by this rule include the following:
(1) Activities related to the repair, rehabilitation, or replacement of any previously authorized, currently serviceable structure or fill or of any currently serviceable structure or fill authorized by this rule, 327 IAC 17-3, or 327 IAC 17-4, provided that the structure or fill is not to be put to uses differing from those uses specified or contemplated for it in the original permit or the most recently authorized modification. Minor deviations in the structure's configuration or filled area, including those due to changes in materials, construction techniques, or current construction codes or safety standards that are necessary to make repair, rehabilitation, or replacement are permitted, provided the adverse environmental effects resulting from the repair, rehabilitation, or replacement are minimal. As used in this subdivision, "currently serviceable" means usable as is or with some maintenance, but not so degraded as to essentially require reconstruction. A permit issued under this subdivision authorizes the repair, rehabilitation, or replacement of those structures or fills destroyed or damaged by storms, floods, fire, or other discrete events, provided the repair, rehabilitation, or replacement is commenced, or is under contract to commence, within two (2) years of the date of their destruction or damage. In cases of catastrophic events, such as tornadoes, this two-year limit may be waived by the commissioner, provided the permittee can demonstrate funding, contract, or other similar delays.
(2) Discharges of dredged or fill material, including excavation, into SRWs to remove accumulated sediments and debris in the vicinity of, and within, existing structures, for example, bridges, culverted road crossings, water intake structures, and the placement of new or additional riprap to protect the structure. The removal of sediment is limited to the minimum necessary to restore the wetland in the immediate vicinity of the structure to the approximate dimensions that existed when the structure was built, but cannot extend further than two hundred (200) feet in any direction from the structure. The placement of riprap must be the minimum necessary to protect the structure or to ensure the safety of the structure. All excavated materials must be deposited and retained in an upland area unless otherwise specifically approved by the commissioner under separate authorization. Any bank stabilization measures not directly associated with the structure will require a separate authorization from the commissioner.
(3) Discharges of dredged or fill material, including excavation, into SRWs, for activities associated with the restoration of upland areas damaged by a storm, flood, or other discrete event, including the construction, placement, or installation of upland protection structures and minor dredging to remove obstructions in a SRW. (Uplands lost as a result of a storm, flood, or other discrete event can be replaced without permit provided the uplands are restored to their original pre-event location. A permit issued under this subdivision is for the activities in SRWs associated with the replacement of the uplands.) The permittee should provide evidence, such as a recent topographic survey or photographs, to justify the extent of the proposed restoration. The restoration of the damaged areas cannot exceed the contours, or ordinary high water mark, that existed before the damage. The department retains the right to determine the extent of the preexisting conditions and the extent of any restoration work authorized by this permit. Minor dredging to remove obstructions from the adjacent wetland is limited to:
(A) fifty (50) cubic yards below the plane of the ordinary high water mark; and
(B) the amount necessary to restore the preexisting bottom contours of the wetland.

The dredging may not be done primarily to obtain fill for any restoration activities. The discharge of dredged or fill material and all related work needed to restore the upland must be part of a single and complete project. This permit cannot be used in conjunction with subdivision (11) to restore damaged upland areas. This permit cannot be used to reclaim historic lands lost, over an extended period, to normal erosion processes. Any work authorized by this permit must not cause more than minimal degradation of water quality or increase flooding. A permit issued under this subdivision authorizes the repair, rehabilitation, or replacement of any previously authorized structure or fill that does not qualify for the 327 IAC 17-1-7(3)(B) exemption for maintenance.

(4) Fish and wildlife harvesting devices and activities, such as duck blinds. A permit issued under this subdivision does not authorize impoundments and semi- impoundments of waters of the state for the culture or holding of motile species.
(5) The use of devices designed to measure and record scientific data, such as the following:
(A) Staff gauges.
(B) Water recording devices.
(C) Water quality testing and improvement devices.
(D) Similar structures.
(6) Survey activities including core sampling, seismic exploratory operations, plugging of seismic shotholes and other exploratory-type boreholes, soil survey, sampling, and historic resources. The following are not authorized under this subdivision:
(A) Discharges and structures associated with the recovery of historic resources.
(B) Drilling and the discharge of excavated material from test wells for oil and gas exploration. However, the plugging of such wells is authorized.
(C) Fill placed for roads, pads, and other similar activities.
(D) Permanent structures.

The discharge of drilling mud and cuttings may require a permit under 327 IAC 5.

(7) Activities required for the construction, maintenance, and repair of utility lines and associated facilities in SRWs as follows:
(A) The construction, maintenance, or repair of utility lines, including outfall and intake structures and the associated excavation, backfill, or bedding for the utility lines, in all SRWs, provided there is no change in preconstruction contours. As used in this clause, a "utility line" means any:
(i) pipe or pipeline for the transportation of any gaseous, liquid, liquescent, or slurry substance, for any purpose; and
(ii) cable, line, or wire for the transmission for any purpose of electrical energy, telephone, and telegraph messages, and radio and television communication. Material resulting from trench excavation may be temporarily side cast (up to three (3) months) into SRWs, provided that the material is not placed in such a manner that it is dispersed by currents or other forces. The commissioner may extend the period of temporary side casting not to exceed a total of one hundred eighty (180) days, where appropriate. In wetlands, the top six (6) inches to twelve (12) inches of the trench should normally be backfilled with topsoil from the trench. Furthermore, the trench cannot be constructed in such a manner as to drain SRWs, for example, backfilling with extensive gravel layers, creating a french drain effect. For example, utility line trenches can be backfilled with clay blocks to ensure that the trench does not drain the SRWs through which the utility line is installed. Any exposed slopes and stream banks must be stabilized immediately upon completion of the utility line crossing of each SRW.
(B) The construction, maintenance, or expansion of a substation facility associated with a power line or utility line, provided that the activity does not result in the loss of greater than one-half (1/2) acre of SRWs.
(C) The construction or maintenance of foundations for overhead utility line towers, poles, and anchors in all SRWs, provided the foundations are the minimum size necessary and separate footings for each tower leg (rather than a larger single pad) are used where feasible.
(D) The construction of access roads for the construction and maintenance of utility lines, including overhead power lines and utility line substations, in SRWs, provided the discharges do not cause the loss of greater than one-half (1/2) acre of SRWs. Access roads shall be the minimum width necessary. Access roads must be constructed so that the length of the road minimizes the adverse effects on SRWs and as near as possible to preconstruction contours and elevations, for example, at grade corduroy roads or geotextile/gravel roads. Access roads constructed above preconstruction contours and elevations in SRWs must be properly bridged or culverted to maintain surface flows. As used in this clause, "utility line" does not include activities that drain a SRW, such as drainage tile or french drains; however, the term does include pipes conveying drainage from another area. For purposes of this clause, the loss of SRWs includes the filled area plus SRWs that are adversely affected by flooding, excavation, or drainage as a result of the project.

Activities authorized by clauses (A) through (C) may not exceed a total of one-half (1/2) acre loss of SRWs. SRWs temporarily affected by filling, flooding, excavation, or drainage, where the project area is restored to preconstruction contours and elevation, are not included in the calculation of permanent loss of SRWs. This includes temporary construction mats, for example, timber, steel, and geotextile, used during construction and removed upon completion of the work. Where certain functions and values of SRWs are permanently adversely affected, such as the conversion of a forested wetland to a herbaceous wetland in the permanently maintained utility line right-of-way, mitigation will be required to reduce the adverse effects of the project to the minimal level. Mechanized land clearing necessary for the construction, maintenance, or repair of utility lines and the construction, maintenance, and expansion of utility line substations, foundations for overhead utility lines, and access roads is authorized, provided the cleared area is kept to the minimum necessary and preconstruction contours are maintained as near as possible. The area of SRWs that is filled, excavated, or flooded must be limited to the minimum necessary to construct the utility line, substations, foundations, and access roads. Excess material must be removed to upland areas immediately upon completion of construction. Access roads used for both construction and maintenance may be authorized, provided they meet the terms and conditions of this rule. Access roads used solely for construction of the utility line must be removed upon completion of the work and the area restored to preconstruction contours, elevations, and wetland conditions.

(8) Return water from upland, contained dredged material disposal area. The dredging itself may require a permit under IC 13-18-22-1. The return water from a contained disposal area is administratively defined as a discharge of dredged material, even though the disposal itself occurs on the upland and does not require an IC 13-18-22-1 permit.
(9) Activities in SRWs associated with the restoration of former wetlands, the enhancement of degraded wetlands and riparian areas, the creation of wetlands and riparian areas, and the restoration and enhancement of streams and open water areas as follows:
(A) The activity is conducted on any of the following:
(i) Nonfederal public lands and private lands, in accordance with the terms and conditions of a binding wetland enhancement, restoration, or creation agreement between the landowner and the U.S. Fish and Wildlife Service (FWS).
(ii) Reclaimed surface coal mine lands subsequent to reclamation bond release and termination of OSM/IDNR jurisdiction under the Surface Mining Control and Reclamation Act and IC 14-34. The future reversion does not apply to streams or wetlands created, restored, or enhanced as mitigation for the mining impacts, or naturally due to hydrologic or topographic features, or for a mitigation bank.
(iii) Other public or private lands.
(B) Planting of only native species shall occur on the site.

Activities authorized by this subdivision include, to the extent that a permit is required under IC 13-18-22-1, the removal of accumulated sediments; the installation, removal, and maintenance of dikes and berms; the construction of small nesting islands; the construction of open water areas; activities needed to reestablish vegetation, including plowing or discing for seed bed preparation and the planting of appropriate wetland species; mechanized land clearing to remove nonnative invasive, exotic, or nuisance vegetation; and other related activities. This subdivision does not authorize the conversion of natural wetlands to another aquatic use, such as creation of waterfowl impoundments where a forested wetland previously existed. However, this subdivision authorizes the relocation of wetlands on the project site provided there are net gains in aquatic resource functions and values. For example, this subdivision may authorize the creation of an open water impoundment in an emergent wetland provided the emergent wetland is replaced by creating that wetland type on the project site. For enhancement, restoration, and creation projects conducted under item (iii), this subdivision does not authorize any future discharge of dredged or fill material associated with the reversion of the area to its prior condition. In such cases, a separate permit would be required for any reversion if not otherwise exempt under this article. For restoration, enhancement, and creation projects conducted under items (i) and (ii), this subdivision also authorizes any future discharge of dredged or fill material associated with the reversion of the area to its documented prior condition and use, that is, prior to the restoration, enhancement, or creation activities if a permit is otherwise required under this article for such reversion activities. The reversion must occur within five (5) years after expiration of a limited term wetland restoration or creation agreement or permit, even if the discharge occurs after a permit issued under this subdivision expires. This subdivision also authorizes the reversion of wetlands that were restored, enhanced, or created on prior-converted cropland that has not been abandoned, in accordance with a binding agreement between the landowner and NRCS or FWS (even though the restoration, enhancement, or creation activity did not require an IC 13-18-22-1 permit). The five-year reversion limit does not apply to agreements without time limits reached under item (i). The prior condition will be documented in the original agreement or permit, and the determination of return to prior conditions will be made by the federal agency or appropriate state agency executing the agreement or permit. Before any reversion activity, the permittee or the appropriate federal or state agency must notify the commissioner and include the documentation of the prior condition. Once an area has reverted to its prior physical condition, it will be subject to whatever regulatory requirements are applicable at that future date.

(10) Discharges of dredged or fill material and maintenance activities that are associated with moist soil management for wildlife performed on federally-owned or managed property, state-owned or managed property, and local government agency-owned or managed property, for the purpose of continuing ongoing, site-specific, wildlife management activities where soil manipulation is used to manage habitat and feeding areas for wildlife. Such activities include the following:
(A) The repair or maintenance of dikes.
(B) Plowing or discing to impede succession, prepare seed beds, or establish fire breaks.

Sufficient vegetated buffers must be maintained adjacent to all open waterbodies, streams, et cetera, to preclude water quality degradation due to erosion and sedimentation. This subdivision does not authorize the construction of new dikes, roads, water control structures, et cetera, associated with the management areas. This subdivision does not authorize converting wetlands to uplands, impoundments, or other open waterbodies.

(11) New construction, agriculture, and mining activities. The following activities are authorized:
(A) New construction activities associated with the construction or installation of new facilities or structures. Typically, these include residential, commercial, industrial, institutional, and recreational activities. These activities include:
(i) filling and grading;
(ii) dredging;
(iii) stormwater, sediment, and erosion control activities; and
(iv) roads, infrastructures, and utilities; provided the individual and cumulative impacts are minimal.
(B) Agriculture and mining activities. These include work or discharges of dredged or fill material associated with the following:
(i) Buildings or work pads.
(ii) Stock piling of material.
(iii) Staging, loading, and unloading areas.
(iv) Roads.
(v) Land leveling.
(vi) Berms, dikes, dams, and ditch construction.
(vii) Drainage facilities.
(viii) Erosion and water control activities. This subdivision does not affect those agricultural and mining activities that are exempt in accordance with 327 IAC 17-1-7.
(C) Discharges of dredged or fill material authorized by this subdivision are limited to one-tenth (0.1) acre or less of SRWs.
(D) Authorization of activities under this rule does not substitute for any separate authorizations required by other local, state, or federal requirements.
(E) Activities that the department determines to have the potential to cause unacceptable adverse impacts on aquatic resources or other public interest factors are not authorized by this subdivision.
(F) The department may on a case-by-case basis require a 327 IAC 17-3 or 327 IAC 17-4 permit. The department will notify the applicant that the project does not qualify for a general permit under this rule and instruct the applicant on the procedures to seek authorization under the 327 IAC 17-3 or 327 IAC 17-4 permit. The department may also require a 327 IAC 17-3 or 327 IAC 17-4 permit for any:
(i) after-the-fact applications; or
(ii) unauthorized activity;

or both, regardless of whether or not the discharge meets the area limitation specified in clause (C).

(c) Wetland activities that would have more than minimal impacts to water quality, either viewed individually or collectively with other projects that may affect the same waterbody affected by the proposed project, are excluded.

327 IAC 17-2-2

Water Pollution Control Board; 327 IAC 17-2-2; filed May 25, 2005, 10:45 a.m.: 28 IR 2973; errata filed Oct 11, 2005, 12:00 p.m.: 29 IR 548; readopted filed Jun 15, 2011, 11:15 a.m.: 20110713-IR-327110193BFA
Readopted filed Jun 29, 2017 9:34 a.m.: 20170726-IR-327170225BFA