326 Ind. Admin. Code 6.8-8-1

Current through May 29, 2024
Section 326 IAC 6.8-8-1 - Applicability

Authority: IC 13-14-8; IC 13-17-3-4; IC 13-17-3-11

Affected: IC 13-15; IC 13-17

Sec. 1.

The continuous compliance plan (CCP) for sources listed in subdivisions (1) through (18) shall contain information on the facilities included in 326 IAC 6.8-2. The following sources shall submit a CCP to the department by December 10, 1993:

(1) ASF-Keystone, Inc.-Hammond.
(2) BP Products North America, Inc.-Whiting Refinery.
(3) Bucko Construction Company, Inc.
(4) Cargill, Inc.
(5) Hammond Group, Inc. (HGI), Halox Division, Lead Products Division, Hammond Expander Division, and Halstab Division.
(6) Resco Products, Inc.
(7) Mittal Steel-Indiana Harbor East Inc.
(8) Mittal Steel-Indiana Harbor West Inc.
(9) Carmeuse Lime Inc.
(10) National Recovery Systems.
(11) NIPSCo-Dean H. Mitchell Station.
(12) Reed Minerals-Plant #14.
(13) Rhodia, Inc.
(14) State Line Energy LLC.
(15) Conopco, Inc. d/b/a Unilever HPC USA.
(16) United States Gypsum Company.
(17) U.S. Steel-Gary Works.
(18) A CCP shall also be submitted by any source in Lake County for facilities that meet the following conditions:
(A) Boilers with heat input capacity equal to or greater than twenty-five million (25,000,000) British thermal units per hour, singly or in combination, that vent through a single stack. Facilities, including boilers and reheat furnaces, configured to burn only natural gas, blast furnace gas, or coke oven gas, or a combination of these gases, are exempt.
(B) Facilities that perform manufacturing operations in a building or structure such that the total uncontrolled PM10 emissions from all such operations amount to ten (10) tons per year or more and that could potentially escape into the atmosphere through roof vents and other openings. The uncontrolled PM10 emissions shall be estimated with "Compilation of Air Pollutant Emission Factors" Volume 1, Stationary Point and Area Sources, AP-42, Fifth Edition, January 1995*, Supplements A through G, December 2000* emission factors or other documentable emission factors acceptable to the commissioner and U.S. EPA.
(C) Each facility, not otherwise required to submit a CCP in accordance with this section with uncontrolled PM10 or TSP emissions that may exceed one hundred (100) tons per year based on eight thousand seven hundred sixty (8,760) hours of operation and AP-42 emission factors or other documentable emission factors acceptable to the commissioner and U.S. EPA.

*These documents are incorporated by reference and are available for purchase from the Government Printing Office, 732 North Capitol Avenue NW, Washington, D.C. 20401 or are available for review and copying at the Indiana Department of Environmental Management, Office of Air Quality, Indiana Government Center-North, Tenth Floor, 100 North Senate Avenue, Indianapolis, Indiana 46204.

326 IAC 6.8-8-1

Air Pollution Control Board; 326 IAC 6.8-8-1; filed Aug 10, 2005, 1:00 p.m.: 28 IR 3533; filed Jan 23, 2008, 1:44 p.m.: 20080220-IR-326040279FRA