326 Ind. Admin. Code 2-8-7

Current through October 23, 2024
Section 326 IAC 2-8-7 - Permit issuance, renewal, and revisions

Authority: IC 13-14-8; IC 13-17-3-4; IC 13-17-3-11

Affected: IC 13-15; IC 13-17

Sec. 7.

(a) A FESOP, FESOP modification, or renewal may be issued only if all of the following conditions have been met:
(1) The commissioner has received a complete application for a FESOP, FESOP modification, or FESOP renewal.
(2) The commissioner has complied with the requirements for public notice under section 13 of this rule.
(3) The conditions of the FESOP provide for compliance with all applicable requirements and the requirements of this rule.
(4) The U.S. EPA has received a copy of the draft FESOP and any notices required and has either:
(A) not objected to the issuance of the FESOP not later than thirty (30) days after receipt of the draft FESOP; or
(B) confirmed that the commissioner has adequately addressed an objection.
(b) The submittal of a complete application shall not affect the requirement that any source have a preconstruction permit under 326 IAC 2-2 through 326 IAC 2-5.1.

326 IAC 2-8-7

Air Pollution Control Board; 326 IAC 2-8-7; filed May 25, 1994, 11:00 a.m.: 17 IR 2274; filed Apr 22, 1997, 2:00 p.m.: 20 IR 2358; filed Nov 25, 1998, 12:13 p.m.: 22 IR 1054