Current through December 12, 2024
Section 326 IAC 2-14-3 - ApprovalsAuthority: IC 13-14-8; IC 13-17-3-4; IC 13-17-3-11
Affected: IC 13-15; IC 13-17
Sec. 3.
(a) A new portable source shall be registered or permitted in accordance with the provisions of 326 IAC 2-5.1 and 326 IAC 2-6.1.(b) A portable source that will be part of an existing source shall be approved through the permit revision procedures under 326 IAC 2-6.1-6, 326 IAC 2-7-10.5, 326 IAC 2-7-12, or 326 IAC 2-8-11.1, as appropriate. The requirement to obtain an operating permit revision approval shall not apply to sources making changes under approved alternative operating scenarios that are incorporated into the source's operating permit. Air Pollution Control Board; 326 IAC 2-14-3; filed Nov 25, 1998, 12:13 p.m.: 22 IR 1066