326 Ind. Admin. Code 18-2.1-6

Current through May 29, 2024
Section 326 IAC 18-2.1-6 - Asbestos abatement contractor license requirements

Authority: IC 13-14-8; IC 13-17-3-4; IC 13-17-3-11; IC 13-17-6

Affected: IC 13-17

Sec. 6.

The following requirements apply to the implementation of an asbestos project at a facility:

(1) Each asbestos abatement contractor is required to have at least one (1) licensed project supervisor, responsible for direct supervision of workers, in the work area of the asbestos project during removal, encapsulation, enclosure, stripping, repair, and work area decontamination activities.
(2) Workers must have access to a project supervisor throughout the duration of the asbestos project.
(3) Each asbestos abatement contractor shall ensure that the current certificate of training or asbestos license, and a photographic identification card, for each project supervisor and worker is kept:
(A) on the job site during an asbestos project; and
(B) outside the work area and available for inspection by the department.
(4) A person employed by the asbestos abatement contractor, or a partner or subsidiary entity thereof, implementing an asbestos project shall not, for the purposes of fulfilling the requirements of 40 CFR 763.90 * collect or analyze air samples for determining the completion of that asbestos project.

*This document is incorporated by reference. Copies may be obtained from the Government Publishing Office, www.gpo.gov, or are available for review at the Indiana Department of Environmental Management, Office of Legal Counsel, Indiana Government Center North, 100 North Senate Avenue, Thirteenth Floor, Indianapolis, Indiana 46204.

326 IAC 18-2.1-6

Air Pollution Control Division; 326 IAC 18-2.1-6; filed 5/9/2019, 2:28 p.m.: 20190605-IR-326090363FRA