Authority: IC 13-1-1-4; IC 13-7-7
Affected: IC 13-1-1-2; IC 13-7-1
Sec. 60.
The operation by which coke is removed from the coke oven and transported to the quench area. The operation begins with the first visible movement of coke and ends when the quenching operation is commenced.
326 IAC 1-2-60