Current through November 6, 2024
Section 312 IAC 29-4-1 - Permit requiredAuthority: IC 14-10-2-4; IC 14-37-3
Affected: IC 14-37
Sec. 1.
(a) A person may not drill, deepen, operate, or convert a well for oil and gas purposes without a permit issued by the division under IC 14-37 and this article.(b) No person may commence drilling, construction, operation, or conversion of a Class II well except in conformance with this article.(c) The original or a copy of the permit must be posted by the operator at the well site before drilling, deepening, or operating a well.Natural Resources Commission; 312 IAC 29-4-1; filed 12/1/2017, 10:35 a.m.: 20171227-IR-312160230FRAReadopted filed 1/17/2023, 1:53 p.m.: 20230215-IR-312220328RFA