312 Ind. Admin. Code 29-23-3

Current through May 29, 2024
Section 312 IAC 29-23-3 - Reporting requirements following significant workover operations

Authority: IC 14-10-2-4; IC 14-37-3

Affected: IC 14-37

Sec. 3.

(a) Within thirty (30) days after conclusion of any significant workover operations, the owner or operator shall submit a report of workover operations to the division.
(b) The report shall be completed on a form prescribed by the division that shall include the following:
(1) A tally of tubing run back in a Class II well.
(2) The setting depth of any packer set in the well.
(3) A description of any modifications or repairs made to well casing or liners.
(4) A description and copy of the cementing job record for any remedial or supplemental cementing of well casing.
(5) A summary of hydraulic fracturing.
(6) A description of any geophysical logs run on the well.
(7) The location and depth interval of any new perforations.
(c) If geophysical logs were run on the well the owner or operator shall provide two (2) copies of each log with the report.
(d) For purposes of this section, a significant workover operation includes any of the following operations:
(1) Setting or unsetting the packer in a Class II well.
(2) Setting or unsetting the packer in an underground gas storage well or an underground petroleum storage well.
(3) Placement or removal of bridge plugs in a well.
(4) Plugging back a well.
(5) Remedial or supplemental cementing of casing or bridge plug.
(6) Installation or removal of casing or liners in a well.
(7) Perforating the production casing in previously unperforated intervals.
(8) Hydraulic fracturing well stimulation treatments.
(9) Any operation that results in a change to the configuration of the well bore.

312 IAC 29-23-3

Natural Resources Commission; 312 IAC 29-23-3; filed 12/1/2017, 10:35 a.m.: 20171227-IR-312160230FRA
Readopted filed 1/17/2023, 1:53 p.m.: 20230215-IR-312220328RFA