312 Ind. Admin. Code 17-1-9

Current through October 2, 2024
Section 312 IAC 17-1-9 - Permits required

Authority: IC 14-38-1-19

Affected: IC 14-37; IC 14-38-1

Sec. 9.

A person who obtains a lease under this rule must obtain a permit under, and conform to the requirements of, IC 14-37 and 312 IAC 29 before commencing a well for oil and gas purposes.

312 IAC 17-1-9

Natural Resources Commission; 312 IAC 17-1-9; filed Feb 23, 1998, 11:30 a.m.: 21 IR 2348; readopted filed Nov 17, 2004, 11:00 a.m.: 28 IR 1315; readopted filed Mar 25, 2010, 2:59 p.m.: 20100421-IR-312100038RFA
Readopted filed 9/30/2015, 12:13 p.m.: 20151028-IR-312150224RFA
Errata filed 1/30/2018, 3:53 p.m.: 20180207-IR-312180068ACA
Readopted filed 5/19/2021, 4:17 p.m.: 20210616-IR-312210111RFA