Authority: IC 14-28-1-5; IC 14-28-3-2
Affected: IC 14-27-7; IC 14-27-7.5; IC 14-28-1; IC 14-28-3
Sec. 33.
"Project condition" means the condition of a flood plain with existing structures, obstructions, deposits, excavations, and the project anticipated by the requested license.
312 IAC 10-2-33