25 Ind. Admin. Code 2-7-7

Current through October 31, 2024
Section 25 IAC 2-7-7 - Contractor provided information

Authority: IC 4-13-2-9; IC 4-13.6-3-1

Affected: IC 4-13.6; IC 5-16-1-1.1; IC 36-1-12

Sec. 7.

The prospective contractor shall supply information requested by the state concerning the responsibility of such contractor. If such contractor fails to supply the requested information, the state shall base the determination of responsibility upon any available information or may find the prospective contractor nonresponsible if such failure is unreasonable.

25 IAC 2-7-7

Indiana Department of Administration; 25 IAC 2-7-7; filed May 4, 1992, 9:30 a.m.: 15 IR 1907; readopted filed Nov 20, 2001, 9:30 a.m.: 25 IR 1265; readopted filed Aug 26, 2008, 8:31 a.m.: 20080910-IR-025080549RFA; readopted filed Oct 18, 2013, 1:38 p.m.: 20131113-IR-025130403RFA
Readopted filed 11/4/2019, 3:40 p.m.: 20191204-IR-025190494RFA