25 Ind. Admin. Code 2-6-7

Current through October 31, 2024
Section 25 IAC 2-6-7 - Confirmation of significantly low bid

Authority: IC 4-13-2-9; IC 4-13.6-3-1

Affected: IC 4-13.6; IC 5-16-2-1

Sec. 7.

A bid significantly below the other bids or the project cost estimate shall not be treated as prima facia evidence of mistake and no bid will be rejected based on presumed error in bid. In such instances the Bid Officer shall ask the low bidder, if represented at the opening, to quickly confirm his bid, while the bid opening is still in session, and if an error is alleged to have been made to submit evidence of such error in a timely manner to the Director, for consideration by the State. If the apparent low bidder is not present at the bid opening, the Bid Officer shall contact him as soon as possible and secure a confirmation of his bid or evidence of error.

25 IAC 2-6-7

Indiana Department of Administration; Public Works Division Sec F,7; filed Feb 29, 1972, 4:10 pm: Rules and Regs. 1973, p. 5; readopted filed Nov 20, 2001, 9:30 a.m.: 25 IR 1265; readopted filed Aug 26, 2008, 8:31 a.m.: 20080910-IR-025080549RFA; readopted filed Oct 18, 2013, 1:38 p.m.: 20131113-IR-025130403RFA
Readopted filed 11/4/2019, 3:40 p.m.: 20191204-IR-025190494RFA