Authority: IC 4-13-1.3-4
Affected: IC 5-22-8-2
Sec. 9.
All purchases for which the amount of the ultimate expenditure is estimated not to exceed the amount set out in IC 5-22-8-2(a) may be made either upon competitive sealed bids or in the open market, at the discretion of the Director. If made in the open market, a manually signed quote must be secured and shall be filed with the requisition. If practicable, two or three quotes shall be secured, but failure to do so shall not prevent the purchase from being made.
25 IAC 1.1-1-9