170 Ind. Admin. Code 8.5-4-27

Current through May 29, 2024
Section 170 IAC 8.5-4-27 - Main extension; exception to commission approval

Authority: IC 8-1-2-47; IC 8-1-2-69; IC 8-1-2-89

Affected: IC 8-1-1-3; IC 8-1-2-89

Sec. 27.

If the cost of the main extension is greater than the free extension cost provided in section 26 of this rule, that extension shall be made, upon receipt by the utility of a signed agreement and a deposit from the applicant, without specific approval of the agreement by the commission.

170 IAC 8.5-4-27

Indiana Utility Regulatory Commission; 170 IAC 8.5-4-27; filed Dec 5, 1990, 3:35 p.m.: 14 IR 569; readopted filed Jul 11, 2001, 4:30 p.m.: 24 IR 4233; readopted filed Apr 24, 2007, 8:21 a.m.: 20070509-IR-170070147RFA; readopted filed Aug 2, 2013, 2:16 p.m.: 20130828-IR-170130227RFA
Readopted filed 4/11/2019, 9:04 a.m.: 20190508-IR-170190136RFA