170 Ind. Admin. Code 8.5-4-22

Current through May 29, 2024
Section 170 IAC 8.5-4-22 - "Subsequent connector's fee" defined

Authority: IC 8-1-2-47; IC 8-1-2-69; IC 8-1-2-89

Affected: IC 8-1-1-3; IC 8-1-2-89

Sec. 22.

As used in this rule, "subsequent connector's fee" means the cash fee equal to the cost per lot of the main extension determined in accordance with sections 29 through 31 of this rule, multiplied by the number of lots for which service is requested.

170 IAC 8.5-4-22

Indiana Utility Regulatory Commission; 170 IAC 8.5-4-22; filed Dec 5, 1990, 3:35 p.m.: 14 IR 568; readopted filed Jul 11, 2001, 4:30 p.m.: 24 IR 4233; readopted filed Apr 24, 2007, 8:21 a.m.: 20070509-IR-170070147RFA; readopted filed Aug 2, 2013, 2:16 p.m.: 20130828-IR-170130227RFA
Readopted filed 4/11/2019, 9:04 a.m.: 20190508-IR-170190136RFA