Current through November 6, 2024
Section 170 IAC 6-1.1-3 - ExemptionAuthority: IC 8-1-31-8
Affected: IC 8-1-2; IC 8-1-31
Sec. 3.
A utility may not file a petition under this rule in the same calendar year in which the utility has filed a request for a general increase in the basic rates and charges of the utility.
Indiana Utility Regulatory Commission; 170 IAC 6-1.1-3; filed Sep 27, 2005, 8:45 a.m.: 29 IR 457; readopted filed Sep 23, 2011, 11:52 a.m.: 20111019-IR-170110397RFA; readopted filed Aug 2, 2013, 2:16 p.m.: 20130828-IR-170130227RFAReadopted filed 4/11/2019, 9:04 a.m.: 20190508-IR-170190136RFA