Authority: IC 8-1-26-26
Affected: IC 8-1-26-16; IC 8-1-26-18; IC 8-1-26-21
Sec. 1.2.
An operator required to supply the location and description of the underground facilities under IC 8-1-26-18 shall, as part of the description, include the following:
(1) A description on the ground near the underground facility or in another manner that ensures the party performing the excavation or demolition receives the description.(2) For pipeline facilities that are service lines, an indication the underground pipeline facility is a service line.(3) For pipeline facilities two (2) inches in diameter and larger, the: (B) material type; of the pipeline facility being located.Indiana Utility Regulatory Commission; 170 IAC 5-5-1.2; filed 9/20/2023, 4:06 p.m.: 20231018-IR-170220359FRA