170 Ind. Admin. Code 17.1-6-1

Current through November 6, 2024
Section 170 IAC 17.1-6-1 - Incentive application required

Authority: IC 8-1-1-3; IC 8-1-37

Affected: IC 8-1-3

Sec. 1.

In order to receive a CHOICE incentive under the CHOICE program, a participating electricity supplier must file an incentive application with the commission:

(1) pursuant to the commission's procedural rules; and
(2) pursuant to this article;

no later than six (6) months after the end of the CPS goal period for which the incentive is being sought.

170 IAC 17.1-6-1

Indiana Utility Regulatory Commission; 170 IAC 17.1-6-1; filed Jul 9, 2012, 3:01 p.m.: 20120808-IR-170120097FRA
Readopted filed 4/12/2018, 11:21 a.m.: 20180509-IR-170180113RFA