Authority: IC 8-1-1-3; IC 8-1-37
Affected: IC 8-1-3
Sec. 1.
In order to receive a CHOICE incentive under the CHOICE program, a participating electricity supplier must file an incentive application with the commission: no later than six (6) months after the end of the CPS goal period for which the incentive is being sought.
170 IAC 17.1-6-1