Authority: IC 8-1-1-3; IC 8-1-37
Affected: IC 8-1-37
Sec. 1.
In order to participate in the CHOICE program, an electricity supplier must file a program application with the commission:
no later than two (2) years after the beginning of CPS goal period I or II.
170 IAC 17.1-4-1