170 Ind. Admin. Code 17.1-3-4

Current through December 12, 2024
Section 170 IAC 17.1-3-4 - Requirements necessary to meet a CHOICE program goal

Authority: IC 8-1-1-3; IC 8-1-37

Affected: IC 8-1-37-3; IC 8-1-37-4

Sec. 4.

(a) In order to meet any of the goals set forth in section 3 of this rule, a participating electricity supplier must:
(1) obtain during the goal period through:
(A) clean energy resources as defined in IC 8-1-37-4; or
(B) clean energy credits as defined in IC 8-1-37-3 that are generated by a facility located in a control area that is part of a regional transmission organization;

an amount of megawatt hours at least equal to the percentage amount set forth in the goal;

(2) use clean energy resources located in Indiana for at least fifty percent (50%) of the clean energy obtained to meet the goal; and
(3) not satisfy more than thirty percent (30%) of the goal using any combination of clean energy resources described in IC 8-1-37-4(a)(17) through IC 8-1-37-4(a)(21).
(b) A participating electricity supplier may apply the amount of:
(1) megawatt hours of clean energy; or
(2) clean energy credits;

that exceed the requirements of a particular goal period to the immediately succeeding goal period.

(c) Except as provided for in IC 8-1-37-4(a)(16) and IC 8-1-37-4(a)(21), clean energy resources that have been:
(1) in service;
(2) purchased; or
(3) contracted for;

before the effective date of the CHOICE program may apply to the goals.

170 IAC 17.1-3-4

Indiana Utility Regulatory Commission; 170 IAC 17.1-3-4; filed Jul 9, 2012, 3:01 p.m.: 20120808-IR-170120097FRA
Readopted filed 4/12/2018, 11:21 a.m.: 20180509-IR-170180113RFA