Authority: IC 8-1-1-3; IC 8-1-37
Affected: IC 8-1-37-12
Sec. 8.
"CPS goal period" is the period of time outlined in IC 8-1-37-12(a) in which an electricity supplier must meet a particular goal under this article.
170 IAC 17.1-2-8
Authority: IC 8-1-1-3; IC 8-1-37
Affected: IC 8-1-37-12
Sec. 8.
"CPS goal period" is the period of time outlined in IC 8-1-37-12(a) in which an electricity supplier must meet a particular goal under this article.
170 IAC 17.1-2-8