170 Ind. Admin. Code 17.1-2-8

Current through October 23, 2024
Section 170 IAC 17.1-2-8 - "CPS goal period" defined

Authority: IC 8-1-1-3; IC 8-1-37

Affected: IC 8-1-37-12

Sec. 8.

"CPS goal period" is the period of time outlined in IC 8-1-37-12(a) in which an electricity supplier must meet a particular goal under this article.

170 IAC 17.1-2-8

Indiana Utility Regulatory Commission; 170 IAC 17.1-2-8; filed Jul 9, 2012, 3:01 p.m.: 20120808-IR-170120097FRA
Readopted filed 4/12/2018, 11:21 a.m.: 20180509-IR-170180113RFA