Authority: IC 9-21-19-2
Affected: IC 8-9.5-4
Sec. 26.
The permitted work shall not be performed on the highway right-of-way between sunset and sunrise, unless specifically allowed by special provision to the permit. The permitted work shall not be performed on the highway right-of-way during the period beginning at 12:00 noon on the last weekday preceding and continuing until sunrise on the following: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving and Christmas.
105 IAC 7-1-26
Transferred from Department of Highways ( 120 IAC 2-1-23.6) to Indiana Department of Transportation ( 105 IAC 7-1-26) by P.L. 112-1989, SECTION 5, effective July 1, 1989.