Authority: IC 8-23-2-5; IC 8-23-2-6
Affected: IC 8-23-26
Sec. 17.
"Ready for contract date" means the date established by the department when all materials will be available for the preparation of contract documents for an improvement project. This date is subject to change depending on the actual progress of the design.
105 IAC 13-2-17