Authority: IC 8-23-2-6
Affected: IC 8-23-10
Sec. 10.
Proposal bids will be marked "regular" or "conditional", and the bidder shall select the word that applies; otherwise, the proposal bids will be considered regular. A bidder may submit either a regular or a conditional proposal bid on a contract unless otherwise stated in the notice to contractors or the special provisions, provided, the bidder submits at least one (1) regular proposal bid in the same group. The sum of a bidder's regular proposal bids in all groups and the bidder's uncompleted work on hand must not exceed the bidder's qualification limits.
105 IAC 11-3-10