Authority: IC 8-23-2-6
Affected: IC 8-23-10
Sec. 15.
"Engineer's estimate" means the department's estimated cost to construct the work covered by the contract.
105 IAC 11-1-15
Authority: IC 8-23-2-6
Affected: IC 8-23-10
Sec. 15.
"Engineer's estimate" means the department's estimated cost to construct the work covered by the contract.
105 IAC 11-1-15