Current through Register Vol. 48, No. 42, October 18, 2024
Section 556.120 - Gas Utility CommitmentsA natural gas utility that has in effect a QIP surcharge tariff shall:
a) Recognize that the General Assembly identifies improved public safety and reliability of natural gas facilities as the cornerstone upon which Section 9-220.3 of the Act is designed, and qualifying projects should be encouraged, selected, and prioritized based on these factors; and [220 ILCS 5/9-220.3(d)(1)]b) Provide information to the Commission as requested to demonstrate that: 1) The projects included in the QIP surcharge tariff are indeed qualifying projects; and2) The projects are selected and prioritized taking into account improved public safety and reliability. [220 ILCS 5/9-220.3(d)(2)]Ill. Admin. Code tit. 83, § 556.120