Ill. Admin. Code tit. 83 § 1328.305

Current through Register Vol. 48, No. 48, December 2, 2024
Section 1328.305 - Wireless Carrier Testing
a) No circuits associated with an authorized wireless 9-1-1 answering point shall be opened, grounded, short circuited or tested in any manner until maintenance personnel have obtained release of the affected circuits from the appropriate 9-1-1 authority. Wireless carrier maintenance personnel shall advise the 9-1-1 authority regarding the length of time that will be required to perform any work involving circuits associated with an authorized wireless 9-1-1 answering point. Wireless carrier personnel shall notify the 9-1-1 authority and the 9-1-1 system provider a minimum of 48 hours prior to performing mobile office switching installations, NPA additions, NXX additions, or any other scheduled event that affects 9-1-1.
b) Each wireless carrier shall adopt mutually agreed upon testing practices, in conjunction with the 9-1-1 authority, to perform, at a minimum, mobile office to PSAP 9-1-1 test calls when any of the following changes occur:
1) New mobile switching office installations;
2) NPA and NXX pANI additions;
3) Local number portability implementations;
4) Number pooling implementations; and
5) Any other event that affects 9-1-1.
c) Each wireless carrier shall develop a testing plan in conjunction with the 9-1-1 system provider and the 9-1-1 authority for inclusion in the 9-1-1 systems' wireless plan that must be submitted to the Administrator.

Ill. Admin. Code tit. 83, § 1328.305

Adopted at 40 Ill. Reg. 8124, effective 5/27/2016