Unless extraordinary operating conditions or events are specified in the proposed layoff plan, no layoff shall be effective until ten (10) working days after the Director's approval of the layoff plan.
Ill. Admin. Code tit. 80, § 620.930
Unless extraordinary operating conditions or events are specified in the proposed layoff plan, no layoff shall be effective until ten (10) working days after the Director's approval of the layoff plan.
Ill. Admin. Code tit. 80, § 620.930