Ill. Admin. Code tit. 74, pt. 300

Current through Register Vol. 49, No. 2, January 10, 2025
Part 300 - JOINT RULES OF THE TREASURER AND THE COMPTROLLER: EXTENSIONS OF TIME FOR THE DEPOSIT OF FUNDS INTO THE STATE TREASURY

Ill. Admin. Code tit. 74, pt. 300

This Part is a joint rule of the Treasurer and the Comptroller. The text of the Part appears at 74 Ill. Adm. Code 700.